LOW RISE

Shandiz | 2018-2019

Luxury Residential

PROJECT OVERVIEW

LOW RISE

The project was a large-scale residential development comprising multiple interconnected buildings organized into three main construction packages. Following an earlier suspension of construction activities, the remaining works were tendered by the project owner and awarded to three major contractors, each responsible for a designated group of buildings within the overall development.
Omran Azarestan Co., the founder’s employer at the time, was responsible for three buildings within one of these construction packages. The buildings were at different stages of completion, ranging from outstanding structural works to architectural finishing and completion activities.
Within this package, the founder had primary technical-office responsibility for Building B2, covering its finishing and completion works, while also overseeing structural technical-office activities across all three buildings under the contractor’s scope.

LOCATION

Shandiz

YEAR

2018-2019

PROJECT TYPE

Luxury Residential

PROJECT VALUE

18 m$USD

PROJECT SCALE

Overall Development: Approx. 250,000 m² / Multi-Building Residential Development

Employer / Contractor at the Time

Omran Azarestan

FUNDER'S ROLE

Full Technical Office Responsibility – Building B2 / Structural Technical Office & Coordination – Three-Building Contractor Package

KEY CONTRIBUTIONS

Held primary technical-office responsibility for Building B2, including quantity take-offs, estimation, procurement support, subcontractor progress measurement and payment documentation, drawing preparation and review, and coordination of finishing and completion activities.

Held technical responsibility for outstanding structural works across all three buildings within Omran Azarestan’s construction package, beyond the founder’s primary B2 assignment.

Coordinated and followed up remaining structural activities, including steel installation, stair structures, foundations, reinforced-concrete walls, and other incomplete structural works across the three buildings.

Prepared quantity take-offs and material estimates associated with structural works across the contractor’s three-building scope.

Supported procurement requirements by determining material quantities and technical requirements for both finishing and structural activities.

Prepared and reviewed subcontractor quantities and progress-payment documentation associated with the founder’s assigned scope.

Prepared, reviewed, and coordinated construction drawings and technical documentation required for ongoing structural and finishing works.

PROJECT GALLERY

Building the vision

PROJECT VIDEOS

Watch the project in motion

VIDEOS

LET’S BUILD SOMETHING GREAT

Have a project in mind?

Get in touch with our team to diucuss your project, explore collaboration opportunities and tum your vision into reality.

PREVIOUS PROJECT

Marmar

Mashhad | 2016 – 2017

NEXT PROJECT

Khane noavari

Shandiz | 2019